• Product
  • Engineered
  • Downloads
    & Services
  • News, Exhibitions
    & Case Studies
  • Access our e-catalogue anytime, anyplace E-Catalogue for iOS and Android
    On the move? You can now view our E-Catalogue on your smartphone or tablet, anytime, anyplace
    Download Pulse for iPad Pulse for iOS and Android
    Pulse gives you the ultimate access to Hager literature on your smartphone or tablet.
  • Follow us on twitter Twitter
    Join in with the #HagerGang by following us on twitter.
    Subscribe to our channel on YouTube YouTube
    Subscribe to our channel to keep up to date with all of our videos.
Filter referenceces
  • Building Types

  • Product Groups

Download the E-Catalogue for iOS or Android
Give us a call
Download Hager literature
Register to receive our newsletter
Follow @hageruk
Watch our videos on YouTube

Lighting for a new generation

Lighting for a new generation

Two education projects in Hartlepool and Stockton have installed Hager’s Klik lighting control system, including the KLCM (Klik’s lighting control module), with both engineers and clients benefitting from its self service functionality.

Grangefield Academy and Manor College have been part of a multi million pound redevelopment and will be handed over to their clients before Easter.

In the classrooms the Klik LCM provides on/off, dimming and scene setting, which comes together using the Klik 7 pin lighting connection system. These can be set by the LCM iOS App, allowing the client to programme individual settings for each room.

Daylight dimming is utilised throughout the installation, reducing energy use further. In the offices, Hager occupancy sensors have also been fitted.

Dan Beames of Lorne Stewart talked enthusiastically about how easy Hager’s Klik lighting control system was to programme. After carrying out his training at Hager, he said, “I ‘got it’ straight away and it’s easy to complete the commissioning ourselves. The iPad App tool for commissioning via Bluetooth has made it quick and easy to commission.”

From classroom to science lab, Dan was impressed with its functionality and explained, “In some rooms I set the inputs to make it easy to get the wiring done (simple on/off at every light switch), where upon completion, I then come back in and upload a pre-saved profile. This saves time, as most of the classrooms have the same profile. Simply connect to the LCM via Bluetooth and the KlikLink App, upload the profile and sync.”

Dan continued, “We have found that, as we complete more projects using Klik LCM we will find better ways to prepare to make it even easier at the installation and commissioning phases. With technical support from Hager on hand at every stage, we are looking forward to our next project”

Dan went on to explain how he has put his new gained knowledge into practice, showing the client representative how easy it is to alter or change the set profile of a room using the App, which will make future management of the facility quick and easy.

Both redevelopments are of school premises and will provide improved teaching facilities, comprising of a sports hall, fitness studio/gym, changing rooms, staff offices, stores, activity studio, dining area, kitchen, hall, drama studio, SEN department, staff facilities, LRC, science labs, and various other classrooms, with associated landscaping and parking.

Grangefield Academy is a £19m redevelopment whilst Manor College is a £14m redevelopment.